Ave Pontós – Borrassa

Execution of the platform construction project of the Madrid-Zaragoza-Barcelona-French Border High-Speed line. Section: Pontós-Borrassa.

  • Contracting body: Administrador de Infraestructuras Ferroviarias (Adif).
  • Location: Gerona (Catalonia).
  • Description: It has a length of 7.2 kilometres, runs through the province of Girona and has six viaducts the lengths of which are: 100 metres over the Riera de Can Fares, 220 metres above the Riera de Santa Anna, 457.5 metres above Plà dels Caboters, 45 metres above the N-II road, 130 metres above the AP-7 motorway and 45 metres over the Rec de la Font Vella. 815,695.91 m 3 are excavated at clearing and 355,514.13 m3 are used for embankment.