11/11/2022
The Regional Minister of Agriculture, Fisheries, Water and Rural Development, Carmen Crespo, has participated in the laying of the first stone of the emergency works for the connection of the tertiary treatment of the Wastewater Treatment Plant (WWTP) of Rincón de la Victoria (Málaga) with the irrigated lands of Sector 8 of the Guaro Plan. A hydraulic project of the General Directorate of Water Infrastructures of the Regional Ministry of Agriculture, Fisheries, Water and Rural Development, divided into three sections. Sando will execute the first of these.
During the ceremony, which was also attended by the President of the Málaga Provincial Council and Mayor of Rincón de la Victoria, Francisco Salado, and the Secretary General of Water, Ramiro Angulo, the Councillor explained the dimensions of the project. The complete connection involves the installation of around 10 km of pipelines for the farmers of the Axarquía between Rincón de la Victoria and Vélez Málaga.
Rincón de la Victoria WWTP
Sando will install 2,135 metres of 600-millimetre diameter cast iron pipes in this infrastructure. The work will start at the Rincón de la Victoria wastewater pumping station and go to the vicinity of the Chilches housing estate. Along the route, Sando will use three pits to make the pipelines that will run under the main Roads along the way.
The project envisages the construction of a new water supply infrastructure. Sando will build a water pumping station equipped with three pumps and the necessary benches for future extensions.
As a company specialising in hydraulic and industrial infrastructures, Sando will also implement the station’s equipment, starting with the electrical connection and transformation centre, as well as the remote control and remote monitoring systems.