Efficiency of the Stone Canal
Efficiency improvement, loss reduction and commissioning of the direct link channel
This project for the efficiency of the Canal de Piedras will rehabilitate deteriorated elements such as the replacement of joints, the repair of the section’s walls and floor screeds and the refurbishment of the service road. Likewise, within the efficiency of the Piedras Canal, the terminal section is adapted to ensure that it drains correctly into the Piedras Canal, efficiency improvements are introduced to avoid water losses, energy savings are made by making the supply by gravity, hydroelectric use is caused due to the difference in level, and it is fed directly from this canal to the Piedras reservoir.