Adaptation of TUSSAM stops
Phase IV of the maintenance and adaptation works at stops on the TUSSAM line network and its immediate surroundings.
The works for the maintenance and adaptation of the stops of the TUSSAM transport network include constructing platforms or the widening of the pavement, including, depending on the case, the lifting of the existing kerb, excavation in the agglomerate of the fairlead for the new alignment of the kerb; preparation of the ground, concreting and subsequent flooring; demolition of the pavement, removal and replacement of pavements; construction of drainage chambers and scuppers, fords and accesses for the disabled; and covering of tree surrounds with drainage grating or paving at TUSSAM stops.