Beach restoration in Denia
Recovery of the natural environment of the Almadraba and Les Deveses beaches in Denia. Alicante
This beach restoration work in Denia aims to control coastal erosion between the Dels Molins Point and the mouth of the Racons River First, breakwater breakwaters are built at the ends of the straight plan and in the centre
It also includes the removal of gravel between the breakwaters and its contribution to the Almadraba beach. Two hundred ninety-four thousand two hundred fifty tonnes of crushed sand, 31,500 tonnes of fine sand and 101,400 tonnes of riprap are used.