Coastal Path, Section 21
Construction work on the Senda Litoral, Section 21. Estepona. Estepona.
The works on the Senda Litoral, Section 21, focus on the construction of a pedestrian walkway three metres wide and 136 metres long, with three different parts: the first, on urbanised ground, in printed concrete with an approximate length of 66 metres; the second through a wooden footbridge with a length of 50 metres and the third, with a 20-metre wooden bridge over the Taraje stream (channelled through breakwater walls). Finally, the pedestrian walkway will be provided with street lighting and landscaping.