El Bobar WWTP
El Bobar WWTP extension project and works Almeria.
The project for the extension of the El Bobar Waste Water Treatment Plant (WWTP El Bobar) includes the replacement of equipment and construction of a new biological reactor to be attached to the existing one and founded on geotechnical level 2 using reinforced concrete slabs; the extension of the sludge recirculation chamber and the primary sludge pumping chamber to house the PIC valves, and a building for changing rooms and a canteen. The increase in average daily flow increases at the El Bobar WWTP from 32,300 m3 to 48,000 m3.