Energy use of the Torre del Águila reservoir
Project for the clean and sustainable use of energy and optimisation of the water resources of the lower Guadalquivir canal – Torre del Águila reservoir interconnection. Utrera (Seville)
The project for the energy use of the Torre del Águila reservoir renovates the facilities to improve the waterproofing, the berm upstream of the dam and the cut-off and aeration elements of the canal-dam interconnection In addition, leaks in the existing prefabricated concrete slabs are reduced, the bottom outlet and the irrigation intake at the dam are renewed, and the slopes are stabilised. The Torre del Águila reservoir has two new generators and a control and management system to manage the real-time information.