Estepona WWTP
Extension and remodelling of the Estepona WWTP.
The extension of the Estepona Wastewater Treatment Plant (WWTP) consists of the construction, installation of equipment and commissioning of a new line for the treatment of a daily flow of 72,000 m3/day and the remodelling of the existing line for the treatment of a daily flow of 28,000 m3/day.
The Estepona WWTP triples its capacity with this intervention and incorporates tertiary treatment to supply 14.3 hectometres of reclaimed water.