Hospital Quirón Málaga

Hospital Quirón Málaga

Cártama (Andalusia)
Sanitary

Hospital Quirón Málaga

Name of the service:

Expansion of the Hospital Quirón in Málaga

Contracting authority: Quirón Hospital Group

The work consists of the extension of the Hospital Quirón Málaga with the adaptation of the ground, first, second and third floors of the existing building for healthcare use. The new facilities cover an area of more than 3,000 square metres and represent an extension and modernisation of its facilities

Depending on each floor, Hospital Quirón Málaga has structured different areas adapted to the specific needs of each room, using specialised materials and systems that ensure the hygiene of the space, the safety of patients, and the optimisation and efficiency of the care provided by the professionals.

Thus, the Nuclear Medicine Unit is on the ground floor; the first floor houses 18 medical consultation rooms; the second floor includes another 8 consultations, an Assisted Reproduction Unit and a Research Unit. The Day Hospital is on the third floor, providing space for 8 independent boxes and a post-anaesthesia recovery room with a significant outpatient surgery unit consisting of four operating theatres. The project also includes the general installations and vertical communications on all four floors.

Sando is building the Hospital Quirón Málaga following the BIM model implemented by the company.

Hospital Quirón Málaga is included in the Spanish ranking of the World’s Best Hospitals 2023 published in Newsweek magazine.

SPECIALIZED BRANDS

Guarantee of project success.

Conacon Sando

Sando Construcción

Related projects

They also trusted us.

Sando Construcción se encarga de los trabajos de rehabilitación del edificio integral del pabellón 12 del Instituto de Salud Carlos III.
Hospitality and Educational

Refurbishment of Pavilion 12 of the Carlos III Health Institute

Madrid (Community of Madrid)
Sando construye el nuevo edificio que actúa como ampliación del Museo Arqueológico Regional de la Comunidad de Madrid, en Alcalá de Henares.
Construction and refurbishment of offices

Alcalá de Henares Archaeological Museum

Madrid (Community of Madrid)
Sando Construcción construye el Intercambiador de Transportes de Ciudad Expo en el complejo Aljarafe Center en Sevilla.
Construction and refurbishment of offices

Aljarafe Central Complex

Seville (Andalusia)
El mantenimiento de viales en l bahía de Algeciras abarca distintas actuaciones en los puertos de la Autoridad Portuaria.
Promenades and public spaces

Maintenance of roads in the Bay of Algeciras

Algeciras (Andalusia)
Sando Construcción realiza la reforma y ampliación del Hospital de Día Onco-Hematológico del Hospital Virgen de la Victoria de Málaga.
Sanitary

Hospital Virgen de la Victoria

Cártama (Andalusia)
Hospital Quirón Marbella
Sanitary

Hospital de Quirónsalud en Marbella

Marbella (Andalusia)
Conacon Sando se encarga del mantenimiento del viario de Bormujos en Sevilla, con acciones para la mejora de la accesibilidad.
Promenades and public spaces

Bormujos Road Maintenance

Seville (Andalusia)
Rehabilitación del edificio del Consorcio de Compensación de Seguros, situado en el Paseo de la Castellana 44 Madrid.
Construction and refurbishment of offices

Consorcio Seguros Building Castellana 44

Madrid (Community of Madrid)