Nonduermas – Sangonera High Speed Train
Mediterranean high-speed Murcia – Almeria corridor platform construction project. Section: Nonduermas – Sangonera.
The Nonduermas – Sangonera AVE project aims to create a double-track railway platform that will allow speeds of up to 300 km/h. The main actions are: a platform for the high-speed double track; assembly of the line’s left track and polyvalent monoblock sleeper; installation of new electronic interlockings to control the Murcia Cargas – Alcantarilla section; construction of a new suburban railway station in Alcantarilla, and remodelling of the track yard of the Murcia Cargas Logistics Complex, among others.