Projects
Mairena and El Viso del Alcor WWTP
Tajuña WWTP
Fuengirola WWTP
Estepona WWTP
Efficiency of the Stone Canal
Modernisation of the irrigable areas of the lower Guadalquivir
Alberche water supply system
Alcalde Juan de Dios Molina Pumping Station
Water supply from Portaje reservoir
Majadahonda DWTP
Construction and operation of the desalination plant at Campo de Dalías
Tomares storm tank
Modernisation of the Torre del Águila reservoir
Maintenance and repair of the Rules and Béznar reservoirs
Modernisation of dams in Cadiz
Disaster Management in the Béznar and Rules dams
Cuevas del Almanzora Dam stilling basin
Melonares Dam
Beach restoration in Denia
Huelva Estuary Walkway
Berths for cruise ships in the Port of Malaga
Expansion of the Port of Algeciras
Extension of the Port of Garrucha
Malaga Levante Dock