Tagus Hospital
Construction and operation of the Tagus Hospital.
The architectural project of the Tagus Hospital consists of the construction, equipping, and operation of the Tagus Hospital (Aranjuez) for 30 years, as well as the replacement and renewal of maintenance.
The construction site of the Tagus Hospital is located on a 146,695 square metre plot, with a built-up area of 35,054 square metres. This space houses five buildings with different uses, structures, and materials distributed around a central courtyard, including a heliport. The main volumes have a fixed structure with adaptable partitions. In contrast, the secondary volumes have a modular and flexible structure with provisions for later modifications and extensions.