Distribution

Water distribution is the process of delivering treated water to final consumers. During this phase, a series of actions must be carried out to ensure that water reaches users safely and in optimal conditions. The main stages of the water distribution process are:

  1. StorageThe treated water is stored in large reservoirs, which allows the supply to be regulated and ensures a continuous supply in case of emergencies (head and tail).
  2. TransportThe stored water is pumped through pipes to distribution points, sometimes over long distances and rugged terrain.
  3. Distribution: Water is delivered to end-users through secondary and tertiary pipe networks extending to supply points.
  4. Quality control: Throughout the distribution process, regular analyses and tests are carried out to verify the quality of the water and ensure that it meets the established standards of potability.
  5. Maintenance and repair of infrastructure: Maintenance and repair work must be carried out on the distribution infrastructure to ensure its proper functioning and prolong its lifetime.

Uninterrupted, quality water service

Water distribution is a critical stage in the integrated water management cycle, as poor management or maintenance can lead to water contamination and put people’s health at risk of water loss, an increasingly severe issue given the scarcity resulting from climate change. For this reason, adequate investments in infrastructure and technology are required to ensure access to safe and quality water for all users.

In this phase of the integral water cycle, Sando Agua carries out activities in the upstream and downstream regulation reservoirs, in the supply network, in the high and low network, in irrigation systems, and in STP (pumping). In Sando’s five decades of experience, it has developed projects of this type throughout the country, such as the supply of the Portaje reservoir in Cáceres, the Alberche system in Toledo and the Juan Dios Molina WWTP in Cádiz, among others.

Estación de Bombeo de Aguas Regeneradas (EBAR) de Rincón de la Victoria

Distribution

We generate sustainable water networks

we tell you more
Always up to date

We put professionals and the latest technological developments at the service of public authoritiess to ensure an uninterrupted and quality water service for users.

In the distribution phase of the water cycle, we carry out construction and maintenance work on the transport networks that extend to the different supply points. By integrating the latest technological developments, such as those associated with the smart water cycle, we ensure safe and efficient water transport to the end user.

related projects

Our experience in distribution

Sando Construcción se encarga de los trabajos de rehabilitación del edificio integral del pabellón 12 del Instituto de Salud Carlos III.
Hospitality and Educational

Refurbishment of Pavilion 12 of the Carlos III Health Institute

Madrid (Community of Madrid)
Sando construye el nuevo edificio que actúa como ampliación del Museo Arqueológico Regional de la Comunidad de Madrid, en Alcalá de Henares.
Construction and refurbishment of offices

Alcalá de Henares Archaeological Museum

Madrid (Community of Madrid)
Sando Construcción construye el Intercambiador de Transportes de Ciudad Expo en el complejo Aljarafe Center en Sevilla.
Construction and refurbishment of offices

Aljarafe Central Complex

Seville (Andalusia)
El mantenimiento de viales en l bahía de Algeciras abarca distintas actuaciones en los puertos de la Autoridad Portuaria.
Promenades and public spaces

Maintenance of roads in the Bay of Algeciras

Algeciras (Andalusia)
Sando Construcción realiza la reforma y ampliación del Hospital de Día Onco-Hematológico del Hospital Virgen de la Victoria de Málaga.
Sanitary

Hospital Virgen de la Victoria

Cártama (Andalusia)
Hospital Quirón Marbella
Sanitary

Hospital de Quirónsalud en Marbella

Marbella (Andalusia)
Conacon Sando se encarga del mantenimiento del viario de Bormujos en Sevilla, con acciones para la mejora de la accesibilidad.
Promenades and public spaces

Bormujos Road Maintenance

Seville (Andalusia)
Rehabilitación del edificio del Consorcio de Compensación de Seguros, situado en el Paseo de la Castellana 44 Madrid.
Construction and refurbishment of offices

Consorcio Seguros Building Castellana 44

Madrid (Community of Madrid)
Sando Construcción ejecuta las nuevas instalaciones logísticas de Mayoral Moda Infantil en el polígono industrial Intelhorce, en Málaga.
Industrial and logistics

Mayoral’s logistics facilities in Malaga

Cártama (Andalusia)
Edificio Velázquez
Construction and refurbishment of offices

Velázquez Building

Madrid (Community of Madrid)

News Services

Conacon Sando ejecuta la primera calle 100% sostenible de las Islas Canarias, bajo encargo del Ayuntamiento de Santa Cruz de Tenerife.

A 100% sustainable street, Conacon Sando’s new project in Tenerife

Se ha inaugurado el nuevo tramo del Corredor Verde construido por Sando en Pizarra. Un proyecto para la recuperación del río Guadalhorce.

Inauguration of the Green Corridor between Pizarra and La Vega Hipólito

Althenia, solutions for decarbonization and CO2 neutralization

Althenia Sando completes the coastal path on Cristo Beach in Estepona

Conacon and Sando Agua carry out the maintenance of canals in irrigable areas of Granada

Althenia will provide the cleaning service for public buildings in San Agustín de Guadalix.

Conacon Sando will once again conserve the road network of the city of Marbella

Sando Agua carries out the maintenance of canals in irrigable areas of Jaén

specialized brands

Guaranteed success in distribution

Sando Agua