AVE Nonduermas – Sangonera

Murcia – Almería high speed Mediterranean corridor platform construction project. Stretch: Nonduermas – Sangonera.

  • Contracting body: Administrador de Infraestructuras Ferroviarias (Adif).
  • Location: Murcia
  • Description: The aim of the project is to generate a double-track railway platform that will allow the circulation of speeds of up to 300 km/h. The main actions are: a platform for a high-speed double track; assembly of the line’s left track and multi-purpose monoblock sleeper; installation of new electronic interlockings for control of the Murcia Cargas – Alcantarilla stretch; execution of a new suburban station in Alcantarilla, and remodelling of the railway yard in the Murcia Cargas Logistics Complex, among others.