El Bobar Sewage Treatment Plan

Project and the expansion work El Bobar Sewage Treatment Plant. Almeria.

  • Contracting Body: Andalusian Environment and Water Agency
  • Location: Almería (Andalusia)
  • Description: Provides for the replacement of equipment and the construction of a new biological reactor that will be joined to the existing one and the foundations will be laid on the geotechnical level 2 using reinforced concrete slab; the enlargement of the sludge recirculation manhole and of the primary sludge pumping manhole to house PIC valves, and a building for changing rooms and canteen. The increase in average daily flow is increased from 32,300 m3 to 48,000 m3.